收藏成功
(推荐电脑端登录)
右上角查看我的术语->我的标签
原文 | 译文 | 详情 |
---|---|---|
提出请求 | Make a request | - |
这些文件 | These documents | - |
买方要求 | Buyer's Requirements | - |
振动值 | Vibration value | - |
主要部件 | Main Components | - |
保证值 | Guaranteed Value | - |
保险费用 | Insurance cost | - |
技术参数 | Technical Parameters | - |
技术服务人员 | Technical service personnel | - |
验收证书 | Acceptance Certificate | - |
承担费用 | Bear expenses | - |
相关费用 | Related expenses | - |
寿命期内 | During the life span | - |
试运 | Commissioning | - |
可靠运行 | Reliable operation | - |
设备缺陷 | Equipment Defects | - |
相应费用 | Corresponding expenses | - |
支付违约金 | Pay liquidated damages | - |
质保 | Quality Assurance | - |
验收试验 | Acceptance Test | - |
现场技术服务人员 | On-site technical service personnel | - |
保证期内 | During the warranty period | - |
项目条款 | Project Terms | - |
免费提供 | Free of charge | - |
设备和材料 | Equipment and materials | - |
安装工作 | Installation work | - |
发生故障 | Failure occurs | - |
稳定运行 | Stable operation | - |
双方协商 | Negotiation between the two parties | - |
投标文件 | Bidding Documents | - |
发生严重 | Serious occurrence | - |
采取各种措施 | Take various measures | - |
权威机构 | Authority | - |
质保期 | Warranty Period | - |
试验过程 | Test process | - |
彻底消除 | Eliminate completely | - |
联合循环 | Combined cycle | - |
工况 | Working conditions | - |
责任方 | Responsible party | - |
蒸汽联合 | Steam combination | - |
正常维修 | Normal maintenance | - |
安全稳定运行 | Safe and stable operation | - |
发生时 | On Occurrence | - |
合同生效 | Contract comes into effect | - |
情况下 | Under the circumstances | - |
交货地点 | Place of Delivery | - |
卖方同意 | Seller agrees | - |
技术性能 | Technical Performance | - |
结束后 | After completion | - |
dB | DB | - |
设施损坏 | Facility damage | - |
调试过程 | Debugging process | - |
现场调试 | On-site commissioning | - |
停运 | Shutdown | - |
合同设备 | Contract Equipment | - |
试验后 | Post-test | - |
指导错误 | Instruction error | - |
检验标准 | Inspection standard | - |
合同规定 | Contractual provisions | - |
届满时 | At expiry | - |
质量优良 | Excellent quality | - |
服务人员 | Service personnel | - |
责任认定 | Responsibility identification | - |
重新计算 | Recalculate | - |
提供技术 | Provision of technology | - |
有关条款 | Relevant Provisions | - |
最终验收 | Final Acceptance | - |
试验所 | Laboratory | - |
质量保证期 | Warranty period | - |
代表应 | The representative shall | - |
协商确定 | Determine through negotiation | - |
执行过程 | Execution Process | - |
严重缺陷 | Serious defect | - |
kJ/kW.h | KJ/kW.h | - |
消耗品 | Consumables | - |
质保期内 | Within the warranty period | - |
违约金 | Liquidated damages | - |
技术人员指导 | Technical personnel guidance | - |
违约责任 | Liability for breach of contract | - |
技术规范 | Technical Specifications | - |
停机时间 | Downtime | - |
经济运行 | Economic operation | - |
保持不变 | Stay the same | - |
发电出力 | Power generation output | - |
保函 | Letter of Guarantee | - |
设计权 | Design right | - |
视为卖方 | Deemed as Seller | - |
由买方负担 | To be borne by the Buyer | - |
类型机组 | Type unit | - |
额定出力 | Rated output | - |
误操作 | Misoperation | - |
严重故障 | Serious malfunction | - |
全部设备 | All Equipment | - |
蒸汽轮机 | Steam turbine | - |
机组热耗 | Unit heat consumption | - |
参数确定 | Parameter determination | - |
招标文件 | Bidding Documents | - |
上述技术 | The above-mentioned technique | - |
合同执行 | Contract Execution | - |
性能考核 | Performance Assessment | - |
时间内 | Within time | - |
提前通知 | Advance notice | - |
原因造成 | Causes | - |
缺陷修正 | Defect Correction | - |
微小缺陷 | Minor defect | - |
卖方应 | The Seller shall | - |
时间相同 | At the same time | - |
潜在缺陷 | Potential Defects | - |
两台 | Two | - |
设备性能 | Equipment Performance | - |
替代产品 | Substitute Products | - |
最大努力 | Best effort | - |
安装现场 | Installation Site | - |
技术问题 | Technical issues | - |
设备制造 | Equipment Manufacturing | - |
足够时间 | Sufficient time | - |
人员应 | The personnel shall | - |
重要工序 | Important Procedures | - |
运行维护 | Operation Maintenance | - |
循环性能 | Cycle performance | - |
安装质量 | Installation quality | - |
原因导致 | Causes | - |
支付费用 | Payment of fees | - |
施工人员 | Construction personnel | - |
买方应 | The Buyer shall | - |
设计值 | Design Value | - |
保证期应 | The warranty period shall | - |
质保金 | Quality Assurance Fund | - |
各种措施 | Various measures | - |
合同附件 | Contract Appendix | - |
工程所在地 | Project Location | - |
设备费用 | Equipment costs | - |
任何部分 | Any part | - |
合同要求 | Contract Requirements | - |
总热耗率 | Total heat consumption rate | - |
各项技术 | Various technologies | - |
同类型机组 | Unit of the same type | - |
设备寿命 | Equipment Life | - |
设备寿命期 | Equipment life cycle | - |
最终责任 | Ultimate responsibility | - |
mm/s | Mm/s | - |
过程中 | In process | - |
燃机 | Gas turbine | - |
卖方保证 | The Seller warrants that | - |
卖方承诺 | Promise of the Seller | - |
运输和保险费用 | Transportation and insurance costs | - |
起始点 | Starting Point | - |
要求卖方 | Require the Seller | - |
试验表明 | Tests show that | - |
修理费用 | Repair costs | - |
试验时间 | Test time | - |
违约责任 | Liability for breach of contract | - |
设计图纸 | Design Drawing | - |
设备损坏 | Equipment Damage | - |
工程现场 | Project Site | - |
非正常 | Abnormal | - |
选型 | Selection | - |
合同条款 | Terms of Contract | - |
最终裁定 | Final ruling | - |
正常磨损 | Normal wear | - |
安全方面 | Security aspects | - |
设备和技术 | Equipment and Technology | - |
附属设备 | Accessory equipment | - |
瓦振值 | Watt vibration value | - |
卖方原因 | Seller's Reason | - |
安装过程 | Installation Process | - |
初步验收 | Initial Acceptance | - |
工业设计 | Industrial design | - |
安装方法 | Installation Method | - |
使用时 | When in use | - |
技术说明 | Technical Description | - |
设备安装 | Equipment Installation | - |
通知买方 | Notify Buyer | - |
运输费 | Transportation cost | - |
买卖双方 | Buyer and Seller | - |
/kJ/kW.h | /kJ/kW.h | - |
有效措施 | Effective Measures | - |
符合安全 | Complying with safety | - |
技术支持 | Technical support | - |
人员费用 | Personnel costs | - |
完毕后 | After completion | - |
设备安全 | Equipment Safety | - |
及时通知 | Notify in time | - |
备品备件 | Spare parts | - |
应负责任 | Be responsible | - |
小时后 | After hours | - |
热耗率 | Heat consumption rate | - |
技术资料 | Technical data | - |
收藏成功
(推荐电脑端登录)
右上角查看我的术语->我的标签